Case Study Search

Search for:  
Search mode:

Search Results:

Performance Technologies Inc.

Industry: Aerospace, Automotive, and Industrial
Process: Turning and Milling

BeforeAfter
• Labor Intensive
• Multiple Machines per part
• Poor quality due to multiple set ups
• One operator produces 10X as much
• Operations combined on one machine
• 60% reduction in part handling

The system allows 4 hours of unattended operation, increasing production capacity 4 hours per day. Part loading time was reduced to 15 seconds and setups were cut in half. Overall machining cycle times were reduced by 50%, and the combining of two machi [...] Read more »


Ronlo Engineering

Industry: Precision Machining Sub Contractor
Process: Multi-Process Machining

BeforeAfter
•Labor intensive process
•Low profit parts
•4 operations with 4 set ups
•Three week lead time
•Unmanned cell operation
•Most profitable parts
•2 operations and 2 set ups
•93% reduction in lead time

The move to multi-process technology reduced machining cycle times by 75% and eliminated 90% of the labor requirement. It compressed manufacturing lead-time from 3 weeks to 1 ½ days, and eliminated 50% of the set ups and part touches. Together with the [...] Read more »


Automatic Products, Inc

Industry: Heavy Truck, Medical, Aircraft & Recreational equipment manufacturers
Process: Multi-Axis Production Turning

BeforeAfter
• 6 week delivery
• Labor intensive process
• Constrained by capacity
• High manufacturing costs
• 4.5 day delivery
• 90% reduction in per-part labor costs
• 50% increase in throughput
• Operating margins doubled

The two-turret, two-spindle machines were capable of simultaneous part processing, supporting a 20% cycle time reduction. The ability to dual-tool each turret station allowed up to 48 tools to be incorporated into the machining process, allowing setup tim [...] Read more »


Kohler Company

Industry: Lawn and turf, recreational, and power generation
Process: Oil Pan Machining Vertical M/C

BeforeAfter
•Multiple set ups and part touches
•Difficult to maintain feature quality
•Significant WIP inventory
•Single process operation
•1.67 Ppk quality on critical features
•Best-in -class cycle time at 4.3 minutes

The solution allowed the part to be completed in a single operation, while meeting the 1.67Ppk requirement on critical features. The cycle time exceeded requirements at 4.3 minutes, including a part load /unload time of just under 5 seconds. [...] Read more »


Latest news & videos from Ellison
      Follow EllisonTech on YouTube      Follow EllisonTech on Twitter      Follow EllisonTech on Facebook
Ellison Locations
To change regions, click on your state in the map

You are in the Northwest region


19625 62nd Ave. South, Suite A109, Kent, WA 98032 P 253.872.1661 F 253.872.2188  Site Map | Contact Us | © 2006 Ellison Technologies